| Domestic |
12/2/25 1918Z | 12/12/25 1700Z | | !CDI 12/002 CDI APRON MAIN 24IN SNOWBANK ADJ 2512021918-2512121700 |
11/22/25 1748Z | 1/6/26 1747Z | | !CDI 11/010 CDI OBST TOWER LGT (ASR 1025057) 400042.30N0813535.40W (2.3NM NNW CDI) 1332.0FT (252.0FT AGL) U/S 2511221748-2601061747 |
11/13/25 0915Z | 2/11/26 0500Z | | !CDI 11/005 CDI OBST TOWER LGT (ASR 1058906) 400213.00N0813309.00W (3.9NM NNE CDI) 1315.9FT (271.0FT AGL) U/S 2511130915-2602110500 |
11/12/25 1643Z | | | !CDI 11/004 CDI OBST CRANE (ASN UNKNOWN) 395858N0813458W (.45NM NW APCH END RWY 22) 40FT (40FT AGL) FLAGGED 2511121643-2512101630EST |
9/24/25 2025Z | 12/24/25 2359Z | | !CDI 09/011 CDI OBST TOWER LGT (ASR 1228355) 400137.30N0813308.50W (3.4NM NNE CDI) 1106.0FT (232.9FT AGL) U/S 2509242025-2512242359 |
5/29/25 1341Z | 12/31/25 2300Z | | !CDI 05/014 CDI AD AP ALL SFC WIP MOWING 2505291341-2512312300 |
12/31/24 1526Z | 12/31/25 2200Z | | !CDI 12/019 CDI OBST POLE (ASN UNKNOWN) 395804N0813501W (0.25NM SW CDI) UNKNOWN (55FT AGL) ERECTED 2412311526-2512312200 |
12/31/24 1523Z | 12/31/25 2200Z | | !CDI 12/018 CDI OBST POWER LINE (ASN UNKNOWN) 395804N0813502W (0.21NM SW CDI) UNKNOWN (45FT AGL) NOT LGTD 2412311523-2512312200 |
12/31/24 1521Z | 12/31/25 2200Z | | !CDI 12/014 CDI OBST POLE (ASN UNKNOWN) 395802N0813502W (0.3NM SW CDI) UNKNOWN (55FT AGL) ERECTED 2412311521-2512312200 |
| FDC |
10/23/25 1722Z | 6/1/26 2355Z | | !FDC 5/5624 CDI ODP CAMBRIDGE MUNI, CAMBRIDGE, OH. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 3... TAKEOFF OBSTACLE NOTE: RWY 4, TEMPORARY CRANE, 4147FT FROM DER, 907FT RIGHT OF CENTERLINE, 140 AGL/940 MSL (2024-AGL-10084-OE). ALL OTHER DATA REMAINS AS PUBLISHED. 2510231722-2606012355EST |