| Domestic |
1/30/26 2207Z | 2/28/26 2200Z | | !DKB 01/022 DKB SVC AUTOMATED WX BCST SYSTEM U/S 2601302207-2602282200 |
1/28/26 0656Z | 2/12/26 0556Z | | !DKB 01/020 DKB OBST TOWER LGT (ASR 1257718) 415537.00N0884114.30W (0.9NM ESE DKB) 1024.0FT (129.9FT AGL) U/S 2601280656-2602120556 |
1/22/26 1049Z | 2/23/26 2359Z | | !DKB 01/018 DKB OBST TOWER LGT (ASR 1009341) 415233.00N0884516.20W (4.1NM SSW DKB) 1382.9FT (499.0FT AGL) U/S 2601221049-2602232359 |
| FDC |
1/29/26 2137Z | | | !FDC 6/8687 DKB IAP DE KALB TAYLOR MUNI, DE KALB, IL. ILS OR LOC RWY 2, ORIG-F... PROCEDURE NA EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, OBK VOR OUT OF SERVICE. 2601292137-2602262137EST |
10/8/25 1735Z | | | !FDC 5/8196 DKB ODP DE KALB TAYLOR MUNI, DE KALB, IL. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 4A... TAKEOFF OBSTACLE NOTES: RWY 2: TREES BEGINNING 1538 FT FROM DER, 110 FT LEFT OF CENTERLINE, UP TO 948 FT MSL. RWY 27: TREES BEGINNING 1737 FT FROM DER, 198 FT LEFT OF CENTERLINE, UP TO 964 FT MSL. TRANSMISSION LINE 2149 FT FROM DER, 996 FT LEFT OF CENTERLINE, 60 FT AGL/966 FT MSL. TRANSMISSION LINE 2688 FT FROM DER, 1110 FT RIGHT OF CENTERLINE, 84 FT AGL/980 FT MSL. TANK 5366 FT FROM DER, 449 FT RIGHT OF CENTERLINE, 156 FT AGL/1047 FT MSL. ALL OTHER DATA REMAINS AS PUBLISHED. 2510081735-2710081735EST |