| Military |
1/30/26 2021Z | 3/2/26 0100Z | | PAR OTS FOR MAINTENANCE AND FLIGHT CHECK. |
1/30/26 2018Z | 2/2/26 2018Z | | M0032/26 NOTAMC M0003/26 |
1/30/26 2016Z | 2/2/26 2016Z | | L0020/26 NOTAMC L0001/26 |
1/30/26 2016Z | 3/6/26 1900Z | | REMAIN CLEAR OF BAGDAD MOA BETWEEN POINTS I AND K (I, J, K) UNLESS ENTRY INTO THE BAGDAD MOA HAS BEEN SCHEDULED/COORDINATED WITH 56FW SCHEDULING AT 623-856-7654 AT LEAST ONE BUSINESS DAY PRIOR. |
1/30/26 2015Z | 3/6/26 1530Z | | LIMA TWY CLOSED BETWEEN PAPA AND QUEBEC TWYS FOR ELECTRICAL MAINTENANCE. |
1/30/26 2014Z | 2/2/26 2014Z | | M0031/26 NOTAMC M0276/25 |
1/30/26 2013Z | 3/5/26 0500Z | Runway | RWY 24L/6R CLOSED FIRST 1,500 FT FOR CONCRETE DEMO. LAST 6,500 FT OF RWY USED FOR CONSTRUCTION VEHICLES AND HAUL ROUTES. |
1/30/26 2010Z | 2/2/26 2010Z | | M0029/26 NOTAMC M0278/25 |
1/30/26 2006Z | 3/5/26 0500Z | | HLP 4 AND 5 CLOSED DUE TO RWY 24L CONSTRUCTION AND VEHICLE HAUL ROUTES. |
1/30/26 0132Z | 2/27/26 0200Z | | VITKO-THREE DEPARTURE RWY 06L/06R NOT AUTHORIZED |
1/30/26 0127Z | 2/27/26 0200Z | | TINNY-FOUR DEPARTURE RWY 24L/24R NOT AUTHORIZED. |
1/29/26 2010Z | 2/23/26 0500Z | | EXCEPTION TO AIRFIELD HOURS FOR FEBRUARY: MON, 2 FEB 1530-0500Z; SUN, 8 FEB 1800-2200Z; MON, 9 FEB 1530-0500Z; THURS, 12 FEB 1530-0030Z; 13-16 FEB (FRI-MON) CLOSED; FRI, 20 FEB 1630-0700Z; SUN, 22 FEB 2200-0700Z; AND MON, 23 FEB 1530-0500Z . AIRFIELD HOURS ARE SUBJECT TO CHANGE UPON FLIGHT OPS COMPLETION AND ARE OPEN TO BOTH TENANT AND TRANSIENT PPR APPROVED AIRCRAFT. |
1/23/26 1923Z | 2/12/26 0030Z | | ROTARY WING FUEL PIT 5 CLOSED FOR MAINTENANCE. COLD TRUCK REFUEL IS AVAILABLE FOR KC130 AIRCRAFT. |
1/20/26 2150Z | 2/20/26 0200Z | | STOVL OPS AUTH RWY 24R ONLY WITHIN THE FIRST 1,500 FT. LSO VEHICLE AND RADIO CHECKOUT AVAIL AT BASE OPS. |
1/9/26 2215Z | 2/9/26 2230Z | | SIERRA TWY CLOSED SOUTH OF RWY 24R DUE TO CONSTRUCTION AND VEHICLE HAUL ROUTES. |
1/6/26 1843Z | 2/6/26 1900Z | | REMAIN CLEAR OF BAGDAD MOA BETWEEN POINTS I AND K (I, J, K) UNLESS ENTRY INTO THE BAGDAD MOA HAS BEEN SCHEDULED/COORDINATED WITH 56FW SCHEDULING AT 623-856-7654 AT LEAST ONE BUSINESS DAY PRIOR. |
1/6/26 1803Z | 2/9/26 1530Z | Runway | RWY 24R/6L SINGLE RWY OPS IN EFFECT. APPROACH END ARRESTING GEAR DE-RIGGED WITH A 3-5 MIN RESPONSE TIME. DEPARTURE END ARRESTING GEAR FULLY RIGGED. PLEASE PLAN AHEAD FOR FUEL IN CASE OF ANY AIRCRAFT EMERGENCIES OR DIVERTS. |
1/6/26 1800Z | 2/9/26 1530Z | | VLP 2 CLOSED DUE TO RWY 24L CONSTRUCTION AND VEHICLE HAUL ROUTES. |
1/6/26 1756Z | 2/9/26 1530Z | | HLP 3 PERIMETER LIGHTING OTS. DEPARTURES AND HOVER CHECKS AUTH FOR DAYTIME USE ONLY. |
1/6/26 1754Z | 2/9/26 1530Z | | AIRFIELD BEACON OTS FOR MAINTENANCE. |
1/6/26 1753Z | 2/9/26 1530Z | | VLP 1 NORTH TAXI ROUTE CLOSED DUE TO RWY 24L CONSTRUCTION. SOUTH TAXI ROUTE OPEN TO ECHO TWY. |